Earthcore GroupStart a project
A custom paver motor court with planted grass joints leading to the arched entry of an Atlanta estate, built by Earthcore Group

Licensed General Contractor · Design–Build · Atlanta · Est. 2018

Creating
environments
that inspire.

Your home is the core.
We build every chapter — and you watch it rise.

Scroll
Est. 2018 AtlantaDesign–Build in house

What Earthcore Group builds

We design it, permit it, and build it — ourselves. One team from the first sketch to the last stone set, so nothing gets lost between the people who drew it and the people who pour it. Or between us and you.

Our design–build process

From first visit to final stone.

01

Site Visit

We walk the land with you.

Every project starts with a walk. We meet you at the property, hear how you actually live in the space, and read the grades, the drainage, the light — the things that decide what's possible. It's also a fit check, both ways: nobody signs anything on day one. If we're the right builder for it, you'll know why. If we're not, we'll say so. Come with photos, boards, back-of-napkin sketches — whatever you've got; the walk is where they turn into a real scope.

Jordan, Earthcore's project lead, smiling on a site visit in the yellow-lettered Earthcore shirt
02

ECG+

Registered for seamless communication.

Before we draw a line, you're in ECG+ — our own app, free, nothing to install. Right after the walk we set up your account, and from that moment your project has one home: reach your project lead with a tap, see every update and photo in one place, and never chase a phone number again. Seamless communication isn't a promise here — it's a setup step.

The ECG+ app's welcome screen — your project's new home
03

Design

Drawn to scale, stamped where needed.

Our design team draws the whole property to scale — grading, drainage, planting, lighting, structures — so every trade that follows works from the same sheet. Where the county requires engineering, the drawings are stamped. You review the renders until the plan reads like the place you meant. It starts by hand: a concept drawn in watercolour over your survey, so you can see the place before anyone breaks ground.

A hand-drawn watercolour concept — house, deck, pavilion and a freeform pool laid over the site's contours
04

Permitting

We stand in that line, not you.

With renders approved, we take the plans through the civil and city process ourselves — site plans, permits, inspections — so you never stand in a county line. It's unglamorous, and it's exactly where projects usually stall. Which is why we own it. The whole set — boundary survey, site plan, grading, erosion control — is assembled and checked in ECG+ before it goes to the county. Timelines there belong to the county, not to us; what we own is preparation so nothing bounces, and straight answers about where it stands.

The permit set for the same pool — proposed pool and spa, paver deck, retaining walls, tree protection and limits of disturbance
05

Billing

Real numbers — subs bid, not you.

The estimate lands as a full scope with real numbers, not a ballpark over the phone. Our trusted subcontractors bid against each other for the work — not against you. The consultation that starts it all is free, and the number you get is one we can actually build. You'll walk the scope with the people who'll actually build it — and adjust until it sits right.

A one-page EarthCore estimate for a gunite pool and spa — every line priced, subtotalled, lying on banana leaves
06

Materials

Sourced and staged before machines arrive.

Before a single machine arrives, the stone, pavers, lumber, and plant material are sourced and staged. Materials chosen early hold the schedule and the budget; materials chosen late hold the project hostage. We choose early. You'll see the deliveries land in your project feed — pallets on the ground before the first machine, which is exactly the point.

A shrink-wrapped pallet of stone coping staged at the edge of a finished pool shell, the raised spa behind it and the excavator still working at the house
07

Build

Our own crews. Weekly in ECG+.

Our own crews, our own equipment — the people who drew the plan are the people standing on it. In ECG+ you watch the build rise week by week with photos from the field, and you can reach your project lead without chasing a phone number. Weekly, in pictures: footings, walls, stone going down — posted from the field to your pocket. Most contractors go quiet. We built an app so we can't.

A pool shell formed in red clay, seen from above, the excavator still working at the house
08

Your Chapter

A space that outlives the trend.

The finished space is the point — the problem you called about, solved, and built to outlive the trend. Your home is the core. This is the chapter we came to build. And the record stays with you: every photo, plan, and decision lives in your ECG+ project — the story of the build, yours to keep.

A finished front porch at dusk — lamps lit, fresh sod, planted beds
Reclaimed granite steppers set into a fresh lawn where it meets a cobblestone drive, built by Earthcore Group

With ECG+ — our own app — in your pocket

It’s so easy to
change the mood.

Light, stone, water, and the right plant in the right place. The same yard, re-read — so the space finally works the way you actually live in it.

01 · Ask ECG+

Ask it anything about your home.

Send a photo of a crack, a wilt, or standing water and Ask ECG+ tells you what it sees — free, whether we built it or not. Ask for a cost estimate. Book a site visit in seconds. It's the real chat, right here.

Free to sign up — live today at earthcore.app, nothing to install.

A real conversation with our AI — nothing you type is saved.

02 · Transparency on the job

You will always know where your project stands.

Watch the build rise week by week. Every update, photo and message lives in one place, with your project lead on the other end. Most contractors go quiet. We built an app so we can't.

ECG+ on iPad: the Backyard Renovation project thread — Jordan shares a first-look render of a raised bluestone patio under a cedar pergola, and the homeowner replies

Transparency on the job — screen 1 of 8: ECG+ on iPad: the Backyard Renovation project thread — Jordan shares a first-look render of a raised bluestone patio under a cedar pergola, and the homeowner replies

From the people we built for

Ten chapters, in their own words.

  • Hi! I never leave reviews but felt the need to leave one for EarthCore because of the great work they did and their professionalism. Everything I envisioned for my yard as a first time home buyer came to life because of them. The app was incredibly useful & simplified everything. They were able to update & communicate promptly which made everything simple. Would highly recommend to my family & friends.

    AshleySandy SpringsGoogle
  • Highly recommend this company! They are incredibly trusted, creative, and have a great eye for design. They transformed our backyard and front porch beautifully. Professional, reliable, and a pleasure to work with from start to finish.

    DidemMorningside, AtlantaGoogle · March 2026
  • Earth Core Group completely transformed our backyard. They built our fence, pool, decking, covered porch, and handled all of the planting. It was a big project, and we’re really happy with how everything turned out. Thanks!

    BarrySandy SpringsGoogle · August 2026
  • EarthCore did a fantastic job helping to design and build our backyard patio in 2022 - it was a significant investment at the time and one that we are glad we did with this team. The work has held up beautifully. Everyone we've come into contact with has been very helpful, detail-oriented, and thoughtful in how they work. It's rare to find professionals who take pride in their craft like the team at EarthCore. In particular, Jordan has been great to work with as minor maintenance issues have come up over the years - always responsive and helpful. They truly care and we'd work with them again!

    NamarAtlantaGoogle · August 2026
  • Fantastic work and always available/reliable to respond to questions and/or come back out if we need them to check something!

    JohnAtlantaGoogle · July 2026
  • Jordan and his tireless team recently took a large backyard originally planted in the fifties that had fallen apart and transformed the space into the landscaped backyard of our dreams. We now look out on charming flagstone pathways, elegant lighting and a huge variety of plants that will hold up year after year. Working with him was both professional and fun, the work was done in a timely manner and the price was better than others we'd been quoted in the past. We went with a younger but still experienced team and we will be singing EarthCore's praises to anyone who will listen. We love our yard now!

    AndreaAtlantaGoogle · July 2026
  • EarthCore Group is awesome! We've had them build our entire backyard including a covered porch, pool, decking, etc and they've done an incredible job. We recently worked with them again to install an outdoor kitchen and additional landscaping/plants. We've been really happy with everything they've done and have really enjoyed working with them. We're already thinking about what projects are next!

    KellySandy SpringsGoogle · September 2026
  • Jordan handled my project (fence/driveway) on time, on budget and knocked it out the park! Highly recommended and will use in my future projects!

    DustinAtlantaGoogle · August 2026
  • Great experience working with a professional, hard working , problem solving crew. Highly recommend them for all kinds of projects.

    LeeAtlantaGoogle · July 2026
  • Earth core group is a great company to work with, they get the job done in a timely manner and have great craftsmanship!

    TrevorAtlantaGoogle · August 2026

Recent work · Metro Atlanta

Pools, hardscape and outdoor living across metro Atlanta.

A white-brick Atlanta home with a new cut-sandstone terrace spanning its rear elevationStart yours →
01

Terrace · Hardscape

The Sandstone Terrace

Metro Atlanta

A rear terrace in cut sandstone, laid tight to the house so the doors open onto one plane of stone — and the lawn takes it from there.

A finished dry-laid stone retaining wall with a chiseled cap and flagstone steps, fronting a Highland Avenue porchStart yours →
02

Masonry · Garden Wall

The Garden Wall

Highland Avenue

A dry-laid stone retaining wall with a chiseled cap, holding the grade for a rebuilt front garden. Laid course by course, by hand.

An Earthcore crew hand-floating a freshly poured concrete panel patio behind a brick homeStart yours →
03

Concrete · The Pour

Cast in Panels

Metro Atlanta

A back patio cast in clean panels and floated by hand. Our own crew, our own equipment, start to finish.

A finished bluestone walkway leading to a covered porch with a warm pendant lightStart yours →
04

Walkway · Porch

The Bluestone Walk

Metro Atlanta

Bluestone treads floated into the lawn, leading to a rebuilt porch. The kind of arrival that makes a house feel finished.

Rooted in Atlanta

The city we build in is the one we show up for.

The whole crew, black tie, at the Captain Planet Foundation gala in Atlanta.

The Earthcore Group crew in black tie with Captain Planet at the Captain Planet Foundation gala in Atlanta

What we build · Design–build in Atlanta

Six things we design and build in Atlanta, start to finish.

The Earthcore shop

Start the design.

Call

A 15-minute discovery call

FreeBook
Walk

An initial site walk

FreeBook
Design

The Design Consultation

The deposit that puts our design team to work on your landscape and outdoor spaces — a concept drawn by hand over your survey, then the whole property drawn to scale.

$350
Emergency

Emergency Visit

Water leak, storm damage, irrigation failure, drainage crisis. We respond right away — or if it's too late at night, first thing in the morning — to assess, stabilize anything urgent, and quote a fix. Visit fee credits toward repair work if you proceed.

$250

Earthcore streetwear

Wear the design.

Earthcore's winter solstice drawing: the sun's arc across a site, the prevailing winds, and the orientation a building is drawn around.

The Winter Solstice Capsule

One drawing, on three garments.

A sun-path study for the winter solstice — the arc across the sky, the winds that cross a site, and the orientation a house gets drawn around. It began as the plate on our design consultation. It was always meant to be worn.

$38Every Chapter Tee in sand, printed with Earthcore's winter solstice sun-path drawing across the chest.

Every Chapter Tee

Heavyweight organic cotton, in sand. The solstice drawing across the chest.

Pick a size
$32The Field Cap in white, with the Earthcore winter solstice drawing printed across the front panel.

The Field Cap

Mesh-back trucker, earned on site. The drawing in ink, on white.

$68The Core Hoodie in washed sage, printed with Earthcore's solstice sun-path drawing over arched EARTHCORE DESIGN & ARCHITECTURE lettering.

The Core Hoodie

Midweight fleece, washed sage. The Winter Solstice sun-path, across the chest.

Pick a size

You might ask us

Five honest answers.

What design and construction services do you provide?

Outdoor living — pavilions, kitchens, and fire features — pools and hardscape, full design–build from first sketch to final stone, landscape and planting design, home renovation and additions, and ADUs. We design it, permit it, and build it ourselves.

How does the design process work from start to finish?

Eight stages, every project: a site visit to make sure we're the right fit; then we set you up in ECG+, our own app, so from that day you reach your project lead with a tap and every update lives in one place; design drawn to scale; permitting we run so you never stand in that line; an estimate with real numbers; materials sourced and staged; the build by our own crews — and then your chapter, the finished space. Most contractors go quiet between those stages. We built an app so we can't.

How long does a design and build project typically take?

It honestly depends on scope and permitting — a terrace moves on a different clock than a whole-property build, and the county owns part of the calendar. What we can promise: at the site visit you get a real range for your specific project, and in ECG+ you watch the build rise week by week, so you are never guessing where things stand.

Can you help design small projects or even single retaining walls?

Yes — we build for homes of every size, shape, and budget. Most of our work is full design–build, but strong standalone hardscape — a wall, a terrace, a drive — is craft we take seriously; there's a dry-laid garden wall in the work above. Bring it to a site visit and we'll tell you honestly whether we're the right fit for it.

How do you determine the project budget?

The design phase produces a full scope with real numbers — our trusted subcontractors bid against each other, not against you. The consultation itself is free; nothing is owed until you put our design team to work. The number you get is one we can actually build.

Ready to start your chapter?

A tight-knit team of builders and design-minded problem solvers, changing the Atlanta construction scene one project at a time.

Send it and our phones buzz. You'll hear from a human the same day — or first thing in the morning if it's late.

How should we reach you? optional
Free consultation · no payment today

Prefer to talk? 678.815.4115

Licensed Georgia general contractor · GA Lic. No. GCLT-CO000732

Follow the work

Visit the shop